Walk through
Note room condition, access and sensitive finishes.
Transitions are easier when scope is recorded before furniture arrives. This page explains how to separate visible preparation, material checks and the final handover note.
A move involves several people with different priorities: the outgoing occupant, the incoming one, a landlord or property manager and sometimes a removal team. A shared description of the rooms keeps their expectations aligned and gives everyone a reference if a question arises later.
Open the Checklist
The sequence below follows the order in which a handover is usually organised. Each stage can be short in a small apartment and more extensive in a larger property.
Note room condition, access and sensitive finishes.
Keep tools, ventilation and protective materials coordinated.
Share completed areas and observations in plain language.
Agree the final state of keys, meter readings and any open points, and write them down together.
Dates, room names and observations are more useful than vague statements about perfection. A handover document should tell the next person what was considered and what remains outside the agreed scope.
Descriptions such as “left window, second bedroom, small mark on the frame” are easier to compare later than general comments. When both parties sign or confirm the same note, the question of what was visible at the time becomes straightforward.
Protective measures matter as well. Floors, door frames and lift walls are often covered during a move, and the note can record that this was done and by whom.
Different finishes call for different attention. The table lists common surfaces in German apartments and houses together with a question worth asking and a detail worth noting.
| Surface | Question Before Work | Detail to Record |
|---|---|---|
| Parquet or oiled timber | Is moisture tolerance limited? | Existing scratches, gaps and areas of fading. |
| Laminate and vinyl | Are edges and joints sealed? | Lifted edges or swollen joints near doors and sinks. |
| Tiles and grout | Which areas stay damp? | Cracked tiles, discoloured joints and sealant condition. |
| Painted walls and skirting | Is the paint washable? | Marks, repairs and areas of fresh paint. |
| Windows and frames | Do hinges and seals move freely? | Condensation marks, damaged seals and loose handles. |
| Kitchen fittings | Who owns each appliance? | Serial labels, shelf condition and extractor filters. |
Preparation and follow-up are different activities. Separating them helps people decide who does what, and when.
The most common handover question is not about how clean a room looks. It is about what the room looked like when the previous occupant left, and whether anyone wrote it down.
This is why the note matters more than the effort invested in any single task. A short, dated description gives the incoming occupant an honest starting point and allows the outgoing occupant to show what was done. It also reduces the number of conversations that depend on memory.
Often the property manager or the incoming occupant prepares a first version, and the other party adds comments. The important point is that all parties see the same text.
No. A rental or acceptance protocol is a separate document with its own legal role. A handover note about care and preparation can sit alongside it and use the same room names.
Record the finding with a date, a location and a photograph, and inform the responsible party in writing as soon as it is practical.
Residential care and deep cleaning pages explain how rooms are described before a move, and the standards page covers how records are kept. Natura can be contacted at Hauptstraße 15, 10117 Berlin, Germany, or by phone on +49 30 5238 9174.
Residential Care Contact Natura